Eight points for acceptance of blank room

2022-07-22
  • Detail

There are only door frames but no doors in the house. The room with only basic treatment but no surface treatment on the wall and ground is called "blank room". Although the blank room has been accepted by relevant departments, buyers need to understand the acceptance standards of the blank room before turning the blank room into a space to show their own personality. As usual Post-80s couples' wedding room ・ fashion expression of petty bourgeoisie wedding room ・ exclusive cash discount for first-class members ・ Mediterranean Style Blue + white ・ mosaic unexpectedly

houses with only door frames and no doors in the house, and walls and floors that are only basic treated but not surface treated are called "rough houses". Although rough houses have been accepted by relevant departments, buyers need to understand the acceptance standards of rough houses before turning them into a space to show their own personality. As usual Post-80s couple's wedding room ・ fashion expression of petty bourgeoisie wedding room ・ exclusive cash discount for first-class members ・ Mediterranean Style Blue + white ・ mosaic is actually home art ・ 50000 young hot mothers create cash discount coupons for two bedroom No.1 store ・ floor heating is not afraid of cold in this winter ・ small household type mix and match new fashion trend ・ 200000 luxury create 95 square meters of space ・ Dulux paint has a high cost performance PK ・ TV wall has a small space and large content

there is only a door frame in the house Houses with doors, walls and floors that only do basic treatment but not surface treatment are called "blank houses". Although blank houses have been accepted by relevant departments, buyers need to understand the acceptance standards of blank houses before turning them into a space to show their own personality. According to the usual standards, the blank room needs to be checked and accepted when delivering the house:

1. All exterior finishes, including the exterior finishes of balcony and rain cover, should be completed according to the design documents

2. All public parts, public facilities, various pipelines (water supply, drainage, rainwater, heating, heating), electrical equipment (distribution boxes, cabinets, panels, sockets, switches, lamps, etc.) should be decorated according to the design documents, and various test items should be completed according to the regulations

3. Various pipelines shall also be subject to water supply, pressure test, ball pass test, heating thermal commissioning and other acceptance work

4. Water storage and sprinkling tests shall be carried out for roof engineering projects

5. If prefabricated floor slab or cast-in-place slab ceiling is used in each room within the door, it shall not be plastered and leveled with putty, so that the slab joint is dense and free of cracks, the joint is smooth without staggering, the surface is flat, the color is basically uniform, and the line angle is straight. The base course ground concrete of each room within the door shall be flat and compacted to achieve firm bonding and no cracks

6. The floor of rooms with waterproof requirements should be planned in strict accordance with the building requirements of waterproof layer and protective layer. Two water storage tests should be carried out during acceptance to ensure no leakage

7. The slope of floor drain and flashing shall meet the design requirements, and the flashing shall not fall. The joint shall be tight and smooth without leakage

8. For the elevation of cement ground base course of various rooms, the height and size requirements for reservation and redecoration should be considered